A numbers check before you change your prices
A short numbers check before you raise prices: effective rate, tax, drawings and whether the diary will actually feel it.
Raising a price because you feel underpaid is a feeling. Raising it because the numbers say the current fee does not clear costs, tax and a modest drawing is a decision. A short check, done before you write the email to clients, keeps the new rate tied to the business rather than to a single frustrating afternoon.
You will still need judgement about what the market will bear. The check stops you guessing the arithmetic as well.
Gather one ordinary month
Take a recent month that was neither your best nor a collapse. List income, the costs of doing the work, the overheads, and what you set aside or should have set aside for tax. The one-page money map is a good sheet for this. If the month only worked because you took no drawing, or skipped the tax transfer, the price is already telling you something.
Do not use a month inflated by a one-off project unless that project is the normal shape of the work. You would be pricing a life you do not have.
See what an hour or a day really pays
Divide the month's income by the hours you actually worked, including quoting, chasing and admin, not only the hours you would put on an invoice. The result is often lower than the day rate you tell people. That gap is why a rise can be necessary even when the advertised rate sounds fine. The comparison between shapes of fee is in day rates and project fees. The check here is whether either shape, at today's number, survives contact with all the hours.
If you sell products or retainers rather than days, do the same with the unit you actually sell. Revenue per unit, minus the direct cost, is the figure that has to carry the overhead.
Test the rise against the floor
Write the rate you are considering and apply it to the same month's volume of work. See what remains after costs and a realistic tax set-aside. Ask whether the remainder could pay the drawing you described in a sustainable drawings figure. If it still cannot, the rise is too small or the costs are too high. A symbolic increase that leaves the month short will disappoint you and still annoy a price-sensitive client.
If the new rate would have made the month comfortable, you have a number you can explain. Costs, time and tax are an explanation. "I felt like it" is a weaker one, even when the feeling was justified.
Check the cash timing
A higher price billed at the end of a long project does not repair next week's balance. Look at the forecast as well as the profit. You may need a deposit or a shorter payment term alongside the rise, not instead of it. Fixing only the rate and leaving the wait untouched is how people celebrate a new price and still feel skint.
Also note who is on the old rate. A rise that applies only to strangers, while the diary is full of legacy clients, will not move the month. The conversation with existing clients has its own timing. Do the arithmetic for the mix you really have.
Write the decision in two lines
Line one: the old effective rate, including admin hours. Line two: the new rate, and the date it applies. File them with the budget. In six months you can see whether the volume held up. If work dropped so far that the higher rate earns less overall, you will want those lines. If work held and the month is calmer, you will want them too, as a reminder not to slide backwards at the first hesitant reply.
The check does not guarantee the client will say yes. It guarantees that the number you ask for is one the business can live on if they do.
Frequently asked questions
What if the honest rate looks too high for my market? Then the gap is a business-model problem: the service, the costs or the hours. Cutting the rate back to an unliveable number is not a solution. Change the offer or the costs, or accept a lower drawing with your eyes open.
Should I check profit or cash? Both. Profit tells you whether the price is enough. Cash tells you whether the calendar will let you enjoy it. A price rise that ignores unpaid invoices will feel like it failed when the failure was timing.
How often should I rerun the check? When costs move, when the work mix changes, or at least once a year before you copy last year's quotes. A rate can become wrong without a dramatic moment.
Steps
- Use an ordinary month, not a highlight: List income, job costs, overheads and the tax that should have been set aside.
- Divide income by all the hours, not only billed ones: Quoting and admin count. Compare the result with the rate you tell clients.
- Apply the proposed rate to the same volume: See whether the remainder can pay a realistic drawing after costs and tax.
- Check cash timing and who is still on the old rate: A higher fee billed late, or only charged to new clients, may not change the next month.